4P Electronics Internal Portal

OQA Manual Inspection

Manual inspections in the selected working days. A working day starts at 08:00. Counts only.

34
Inspections
In the selected days
0%
OK rate
OK inspections
34
NG
NG inspections
27
Work orders
Distinct work orders

Inspections by day

OK NG

0 12 25 23 Aug: 0 OK, 2 NG 28 Aug: 0 OK, 1 NG 29 Aug: 0 OK, 2 NG 02 Sep: 0 OK, 1 NG 16 Sep: 0 OK, 1 NG 03 Oct: 0 OK, 25 NG 24 Oct: 0 OK, 1 NG 03 Nov: 0 OK, 1 NG 23 Aug 28 Aug 29 Aug 02 Sep 16 Sep 03 Oct 24 Oct 03 Nov

Daily trend

OK NG

0 12 25 23 Aug 28 Aug 29 Aug 02 Sep 16 Sep 03 Oct 24 Oct 03 Nov 23 Aug: 0 OK, 2 NG 28 Aug: 0 OK, 1 NG 29 Aug: 0 OK, 2 NG 02 Sep: 0 OK, 1 NG 16 Sep: 0 OK, 1 NG 03 Oct: 0 OK, 25 NG 24 Oct: 0 OK, 1 NG 03 Nov: 0 OK, 1 NG

Defects

Defect lines on NG inspections.

Broken 5
Foreign material 5
THIEC ROI(NO THIEC) 5
Chip drop 4
Solder ball 4
Deformation 3
Flux drop 3
THIEU THIEC( THUNG LO) 2
DIRTY 1
ROI BOND 1
THIEU THIEC 1

By line

Top 12.

LINE 2.1 4
LINE 3.1 4
LINE 5.2 4
LINE 6.1 3
LINE 6.2 3
LINE 7.1 3
LINE 7.2 3
LINE 1.1 2
LINE 1.2 2
LINE 2.2 2
LINE 5.1 2
LINE 3.2 1

By job name

Top 12.

EAX69500001 7
EAX69586101 3
EAX01923701 2
EAX67428601 2
EAX67433989 2
EAX68623807 2
EAX69384901 2
EAX70179111 2
EAX67643314 1
EAX67643315 1
EAX68422586 1
EAX69420401 1